Camping In Southwest Michigan

Friday, April 21, 2006

Our Progress

When we purchased this property in 2004, it needed a lot of repairs! That's an understatement. The cabins hadn' been used for anything except storage for 30 years. We first set out to remodel the north bath house. We rented this huge digger and dug a trench for the water, gas, and power lines. It was cool, even our son was in the digger. We replaced everything and David built great cedar stalls.

Then we moved on to the electricity. BIG job....

We are now finishing up the two cabins that were previously called "The Green Cabins". We have now named them The Pine and The Oak. David built these great lofts in each one and some very cool railings (and the ladder is cool too).

0 Comments:

Post a Comment

<< Home